Tuesday, 11 August 2015 06:54

10 KWp PV Solution Denmark

May 2015, Danish Green Technology Inc. (DGT) was engaged by Lundberg Autoglas ApS.

-to develop and manage the Design, Delivery, Installation and Commissioning of the proposed 10 KW PV Solar plant at Lundberg Autoglas in Denmark.

20150625 184726

The project was funded by Lundberg Autoglas. Owners’ equity of 100. Feasibility and Concept developed by DGT.
The Case Study features the Key Objectives, Owner’s Energy Profile, Technical, Commercial terms, Acc. Savings, Repayment schedule and Rate of Return (ROI).
Complete Case Study project documentation and feasibility simulations to be provided upon request.
The Case Study profile for Lundberg Autoglas is ATYPICAL due to the relatively small size.

10 KWp Industrial PV-system Denmark (Case Story)
Project details
Location    Denmark
Installation date    June 30 2015
Installed capacity    10 KWp
Client    Lundberg Autoglas
Technology    Photovoltaic
Solution    Roof-mounted Grid tied PV

May 2015, Danish Green Technology Inc. (DGT) was engaged by Lundberg Autoglas ApS.
-to develop and manage the Design, Delivery, Installation and Commissioning of the proposed 10 KW PV Solar plant at Lundberg Autoglas in Denmark.
The project was funded by Lundberg Autoglas. Owners’ equity of 100. Feasibility and Concept developed by DGT.
The Case Study features the Key Objectives, Owner’s Energy Profile, Technical, Commercial terms, Acc. Savings, Repayment schedule and Rate of Return (ROI).
Complete Case Study project documentation and feasibility simulations to be provided upon request.
The Case Study profile for Lundberg Autoglas is ATYPICAL due to the relatively small size.


 

Prepared by: DGT Management Team
Date: February 09, 2015
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Home: www.danishgreentech.com
Phone: (USA)+1954 780 8555

Subscribe to our email list and stay up-to-date with all our awesome releases and latest updates.